Wadgare Isa 5 years ago 11/6/2018 1:46:26 AM
Simple and comprehensive summary, very educative and enticing
0 | 0 |
Akin Ayeni 5 years ago 8/31/2018 4:55:47 AM
Generators and public utility power can also be synchronized. But, the parameters mentioned above must be fulfilled before that can take place.One is considered as a Master/Primary which is the running source, the other(s) as Slave(s)/Secondary. Parameters on Slave must match with the Master for synchronisation to work.
1 | 0 |
Paul Ugochukwu Ezeilo 5 years ago 8/19/2018 3:07:37 AM
The above displayed generator, does it require hardware synchronization or is this done via online only?
0 | 0 |
Ibrahim Abubakar 5 years ago 8/11/2018 11:51:49 PM
Also phase sequence and wave form must be the same. Although these two parameters are fixed by the construction of the generator and it connection to the system. A wrongly connected phase sequence will cause voltage opposition which will lead to short circuit
4 | 0 |
Wadgare Isa 5 years ago 11/6/2018 1:46:26 AM
Simple and comprehensive summary, very educative and enticing